Recommendation: That, on the
recommendation of the Acting Executive Director, Planning, Environmental and
Engineering Services and City Engineer, the following actions be taken with
respect to the contract award for the Stanley Street Sanitary Pumping Station
construction project (ES2414/ES5084-11):
a) the
bid submitted by Hayman Construction Inc. (Hayman), 636 Wellington Street,
London, Ontario, N6A 3R9, at its tendered price of $962,700.00, excluding
H.S.T., for the construction of the new Stanley Street Sanitary Pumping
Station BE ACCEPTED; it being noted that the bid submitted by Hayman
was the lowest of four bids received and meets the City’s specifications and
requirements in all areas;
b) Dillon
Consulting Limited (Dillon), 130 Dufferin Avenue, Suite 1400, London, Ontario,
N6A 5R2, BE AUTHORIZED to complete the remainder of the design and
carry out the resident inspection and the contract administration for the
said project, in accordance with the estimate, on file, at an upset amount of
$180,459.40, excluding H.S.T.; it being noted that this firm completed the
Environmental Assessment (EA) and the engineering design, based upon the Fee
Guideline for Professional Engineering Services recommended by the Ontario
Society of Professional Engineers, and in accordance with Section 15.2 (g) of
the City of London’s Procurement of Goods and Services Policy;
c) minor
additional annual operating costs of $5,000.00 BE RECOGNIZED as a
result of this project; it being noted that these costs are due to new
infrastructure installation and will be considered and accommodated within
future Wastewater and Treatment operating budgets;
d) the
funding for this project BE APPROVED as set out in the Sources of
Financing Report provided as Appendix “A” to the associated staff report,
dated April 2, 2012;
e) the
Chief Surveyor BE DIRECTED to initiate the process to legally close
the easterly 50 metres of Becher Street that is no longer travelled, and to
initiate the process to dedicate and name the easterly 70 metres of Becher
Street that is publically travelled, thus resulting in the realignment of the
east end of Becher Street;
f) the
Civic Administration BE AUTHORIZED to undertake all the administrative
acts that are necessary in connection with this project, and, in the event
that the Committee of Adjustment denies the Minor Variance application, the
Civic Administration BE DIRECTED to appeal the decision;
g) the
approval given herein BE CONDITIONAL upon the Corporation entering
into a formal contract or issuing a purchase order for the material to be
supplied and the work to be done relating to this project; and,
h) the
Mayor and the City Clerk BE AUTHORIZED to execute any contract or other
documents, if required, to give effect to these recommendations. (2012-W07-00)
|