That, on the recommendation of the Managing
Director Environmental and Engineering Services and City Engineer, the
following actions be taken with respect to City of London’s contribution to
infrastructure funded through the Ministry of Natural Resources and
Forestry’s Water and Erosion Control Infrastructure capital cost share
program:
a)
the
Upper Thames River Conservation Authority BE AUTHORIZED to carry out the
following projects in concert with the City in the total amount of
$2,171,500.00, including contingency, excluding H.S.T.; it being noted that
the requirements of this provincial funding program are unique, in that only
conservation authorities can apply, requiring 14.3.a) of the Procurement of
Goods and Services Policy:
i) West
London Dykes Phases 3 - 9 Design;
ii) London
Earth Dykes Preliminary Engineering Feasibility;
iii) Fanshawe
Dam Transformer Station and Standby Generator Replacement;
iv) West
London Dyke Phase 3 Construction;
v) Broughdale
Dyke Environmental Assessment;
vi) Riverview
Dyke Environmental Assessment;
vii) Interim
Repairs Broughdale & Clarence-Nelson;
viii) Fanshawe
Motor Control Centre Replacement;
ix) Fanshawe
Dam Operation and Maintenance Schedule Manual;
x) Fanshawe
Dam Paint Phase 4 - pre-engineering; and,
b) the
financing for this work BE APPROVED as set out in the Sources of Financing
Report appended to the staff report dated August 22, 2016, as Appendix
"A"; and,
c) the
Civic Administration BE AUTHORIZED to undertake all the administrative acts
that are necessary in connection with this work. (2016-E08)
|