That, on the recommendation of the Deputy City Manager, Environment and Infrastructure, the following actions be taken with respect to the staff report dated November 29, 2022, related to an award of contract for the Request for Proposal RFP-2022-170 – Rapid Transit Shelter Infrastructure project:
a) Enseicom BE APPOINTED to undertake engineering and prototype fabrication, at an upset amount of $563,496.55, including contingency (excluding HST), in accordance with Section 15.2 (e) of the City of London’s Procurement of Goods and Services Policy;
b) the Civic Administration BE AUTHORIZED to appoint Enseicom as the Vendor of Record for fabrication, supply, and installation of rapid transit shelter infrastructure for periods of one (1) year for final engineering design and prototype works and three (3) years for fabrication, supply, and installation with an option for renewal based on positive performance and price;
c) the Civic Administration BE AUTHORIZED to undertake all administrative acts that are necessary in connection with this project;
d) the approval given herein, BE CONDITIONAL upon the Corporation entering into a formal contract with Enseicom for this work;
e) the funding for the engineering completion and prototype works BE APPROVED as set out in the Source of Financing Report, as appended to the above-noted staff report; and,
f) the Mayor and the City Clerk BE AUTHORIZED to execute any contract or other documents, if required, to give effect to these recommendations. (2022-T03)