That, on the recommendation of the Managing Director, Environmental and Engineering Services and City Engineer, the following actions be taken with respect to the appointment of consulting engineers for the Infrastructure Renewal Program:
a) the following consulting engineers BE APPOINTED to carry out consulting services for the identified 2021/2022 Infrastructure Renewal Program, at the upset amounts identified below, in accordance with the estimate on file, and in accordance with Section 15.2(e) of the City of London’s Procurement of Goods and Services Policy:
i) IBI Group Professional Services (Canada) Inc. BE APPOINTED consulting engineers to complete the pre-design and detailed design of the 2021/2022 Infrastructure Renewal Program Assignment G, Elizabeth Street and Lyle Street Reconstruction, in the total amount of $146,872.00 (including contingency), excluding HST;
ii) Archibald, Gray and McKay Engineering Limited BE APPOINTED consulting engineers to complete the pre-design and detailed design of 2021/2022 Infrastructure Renewal Program Assignment H, Glen Cairn Park Area Reconstruction, Glen Cairn Park from Thompson Road to Helena Avenue to Chesterfield Avenue, Chesterfield Avenue from Thompson Road to Shirl Street and Westlake Street from Chesterfield Avenue to Gladstone Avenue, in the total amount of $264,000.00 (including contingency), excluding HST;
iii) Stantec Consulting Ltd. BE APPOINTED consulting engineers to complete the pre-design, and detailed design of the 2021/2022 Thames River Watermain Remediation Project at the west end of Huron Street from west of The Parkway to Philip Aziz Avenue, in the total amount of $198,899.80 (including contingency), excluding HST; and,
iv) AECOM Canada Ltd BE APPOINTED consulting engineers to confirm the pre-design, complete the detailed design and construction administration of 2021 Wonderland Road Watermain Installation Project, Wonderland Road from Hamlyn Street to Exeter Road, in the total amount of $194,963.00 (including contingency), excluding HST;
b) the financing for the above-noted projects BE APPROVED, in accordance with the “Sources of Financing Report”, as appended to the staff report dated September 22, 2020;
c) the Civic Administration BE AUTHORIZED to undertake all the administrative acts that are necessary in connection with this work;
d) the approvals given, herein, BE CONDITIONAL upon the Corporation entering into a formal contract with each consultant for the respective project; and,
e) the Mayor and the City Clerk BE AUTHORIZED to execute any contract or other documents, if required, to give effect to these recommendations. (2020-E08)