Agenda Including AddedsCivic Works CommitteeThe 10th Meeting of the Civic Works CommitteeTuesday, August 11, 2020 at 12:00 P.m. - 1:00 P.m.Virtual Meeting - during the COVID-19 EmergencyCity Hall is open to the public, with reduced capacity and physical distancing requirements.Meetings can be viewed via live-streaming on YouTube and the City website.MembersCouncillors S. Lehman (Chair), S. Lewis, M. Cassidy, P. Van Meerbergen, E. Peloza, and Mayor E. HolderThe City of London is committed to making every effort to provide alternate formats and communication supports for Council, Standing or Advisory Committee meetings and information, upon request. To make a request for any City service, please contact [email protected] or 519-661-2489 ext. 2425. To make a request specific to this meeting, please contact [email protected].1.Disclosures of Pecuniary Interest 2.Consent 2.1Kilally South, East Basin Municipal Class Environmental Assessment: Notice of Completion 1.2020-08-11 SR Kilally South, East Basin EA Notice of Completion.pdf2.2020-08-11 SR Kilally South, East Basin EA Notice of Completion - Appendix A.pdf2.2Mud Creek Remediation - Phase 1A Tunnel Contract Award and Consultant Contract Increase 1.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel.pdf2.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix A.pdf3.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix B.pdf4.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix C.pdf2.3Request for Contract Increase - Dingman Creek Pumping Station Forcemain Installation Contract #2 1.2020-08-11 SR Contract Increase Dingman Creek PS Forcemain.pdf2.2020-08-11 SR Contract Increase Dingman Creek PS Forcemain - Appendix A.pdf2.4Award of Consulting Engineering Services for the South and West London Water Servicing Study RFP 20-36 1.2020-08-11 SR Award - South and West London Servicing Study.pdf2.2020-08-11 SR Award - South and West London Servicing Study - Appendix A.pdf2.5Wellington Gateway Transit and Municipal Infrastructure Improvements - Appointment of Consulting Engineer 1.2020-08-11 SR Wellington Gateway Transit.pdf2.2020-08-11 SR Wellington Gateway Transit - Appendix A.pdf2.6East London Link Transit and Municipal Infrastructure Improvements Appointment of Consulting Engineer 1.2020-08-11 SR East London Link Transit.pdf2.2020-08-11 SR East London Link Transit - Appendix A.pdf2.7New Traffic, Pedestrian and Cyclist Signals 1.2020-08-11 SR New Traffic Signals.pdf2.8Replacement of Highway 401 / Dingman Drive Bridge Memorandum of Understanding for the Design and Construction of Provisions to Accommodate Future Widening of Dingman Drive 1.2020-08-11 SR Dingman Overpass - MTO MoU.pdf2.9Contract Price Increase: Tender T19-18 - Traffic Signal Reconstruction Southdale Road at Wharncliffe Road South 1.2020-08-11 SR Contract Increase Southdale-Wharncliffe Traffic Signal.pdf2.2020-08-11 SR Contract Increase Southdale-Wharncliffe Traffic Signal - Appendix A.pdf2.10Strategic Plan Progress Variance 1.2020-08-11 SR Strat Plan Variance Report - CWC.pdf2.11Contract Award: Tender No. RFT20-35 - Huron Industrial Lands Stormwater Management Facility and Consultant Appointment 1.2020-08-11 SR Huron Industrial SWMF Contract Award.pdf2.2020-08-11 SR Huron Industrial SWMF Contract Award - Appendix A.pdf3.2020-08-11 SR Huron Industrial SWMF Contract Award - Appendix B.pdf2.12(ADDED) Irregular Results Request for Contractor Appointment: Powell Drain Culvert Replacement and Natural Channel Rehabilitation (RFT20-97) 1.2020-08-12 SR Powell Culvert Replacement.pdf2.2020-08-12 SR Powell Culvert Replacement - Apendix A.pdf3.Scheduled Items 4.Items for Direction 5.Deferred Matters/Additional Business 5.1Deferred Matters List 1.CWC Deferred List as at July 31, 2020.pdf6.Adjournment No Item Selected This item has no attachments1.2020-08-11 SR Kilally South, East Basin EA Notice of Completion.pdf2.2020-08-11 SR Kilally South, East Basin EA Notice of Completion - Appendix A.pdf1.2020-08-11 SR Contract Increase Dingman Creek PS Forcemain.pdf2.2020-08-11 SR Contract Increase Dingman Creek PS Forcemain - Appendix A.pdf1.2020-08-11 SR Award - South and West London Servicing Study.pdf2.2020-08-11 SR Award - South and West London Servicing Study - Appendix A.pdf1.2020-08-11 SR New Traffic Signals.pdf1.2020-08-11 SR Dingman Overpass - MTO MoU.pdf1.2020-08-11 SR Contract Increase Southdale-Wharncliffe Traffic Signal.pdf2.2020-08-11 SR Contract Increase Southdale-Wharncliffe Traffic Signal - Appendix A.pdf1.2020-08-11 SR Huron Industrial SWMF Contract Award.pdf2.2020-08-11 SR Huron Industrial SWMF Contract Award - Appendix A.pdf3.2020-08-11 SR Huron Industrial SWMF Contract Award - Appendix B.pdf1.2020-08-11 SR East London Link Transit.pdf2.2020-08-11 SR East London Link Transit - Appendix A.pdf1.2020-08-11 SR Wellington Gateway Transit.pdf2.2020-08-11 SR Wellington Gateway Transit - Appendix A.pdf1.CWC Deferred List as at July 31, 2020.pdf1.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel.pdf2.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix A.pdf3.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix B.pdf4.2020-08-12 SR Mud Creek Remediation Phase 1A Tunnel - Appendix C.pdf1.2020-08-11 SR Strat Plan Variance Report - CWC.pdf1.2020-08-12 SR Powell Culvert Replacement.pdf2.2020-08-12 SR Powell Culvert Replacement - Apendix A.pdf