That the following actions be taken with respect to new sidewalks in 2021 infrastructure reconstruction projects:
a) the Civic Administration BE DIRECTED to consider the following:
i) narrowing pavement widths to 6.5 metres (or as narrow as 6.0 metres, if necessary) in order to reduce the risk of destabilizing existing trees, as well as curb-facing sidewalks;
ii) removal of on-street parking on one side of the street;
iii) sidewalk widths of 1.5 metres; and.
iv) implementation of construction techniques that may be more labour-intensive, but could increase the likelihood of retaining more of the existing trees, while adding sidewalks; and,
b) Civic Administration BE DIRECTED to move the proposed sidewalk on the West side of Imperial Road to the East side of Imperial Road;
it being noted that the delegations from the following individuals, with respect to this matter, were received:
• R. Standish
• S. Nazarian
• L. Dang
• P. Cobrin
• T. Hutchinson
• G. Pavlov
• L. Kari
• J. Menard
• J. Preston
• D. Cuthbert
• J. Cuthbert
• H. Post
• A.M. Grantham
• S. Skelton
• P. Traylen
• D. Gibbs
• B. Gibbs
• D. McCagherty
• J. P. New
• R. Rudell
• F. Lucente
• J. Lucente
• P. Hubert
• R. Tribe
• W. Handler
• J. McColl
• A. Harris-Schulz
• M. Mannering
• S. Connolly;
it being noted that the communications from the following individuals, with respect to this matter, were received:
• M. Box
• L. Savage
• N. Fulford
• C. Pawlowski
• P. and D. Hayman
• J. Klassen
• S. Franke
• P. and B. Traylen
• A. Kenzie
• J. and W. McGregor
• J. Kingsley
• G. Glinavs
• D. Waithe
• P. MacLennan
• V. Garfat
• S. Mahipaul
• C. Golder and K. Yano;
it being further noted that the resubmitted staff report dated February 9, 2021, with respect to this matter, was received (2021-T04).